Regulation 2015/1222 - Guideline on capacity allocation and congestion management

Please note

This page contains a limited version of this dossier in the EU Monitor.

1.

Current status

This regulation has been published on July 25, 2015 and entered into force on August 14, 2015.

2.

Key information

official title

Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management
 
Legal instrument Regulation
Number legal act Regulation 2015/1222
CELEX number i 32015R1222

3.

Key dates

Document 24-07-2015; Date of adoption
Publication in Official Journal 25-07-2015; OJ L 197 p. 24-72
Effect 14-08-2015; Entry into force Date pub. +20 See Art 84
Deadline 31-12-2017; At the latest See Art 83.2
End of validity 31-12-9999

4.

Legislative text

25.7.2015   

EN

Official Journal of the European Union

L 197/24

 

COMMISSION REGULATION (EU) 2015/1222

of 24 July 2015

establishing a guideline on capacity allocation and congestion management

(Text with EEA relevance)

THE EUROPEAN COMMISSION,

Having regard to the Treaty on the Functioning of the European Union,

Having regard to Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003 (1) and in particular Article 18(3)(b) and (5),

Whereas:

 

(1)

The urgent completion of a fully functioning and interconnected internal energy market is crucial to the objectives of maintaining security of energy supply, increasing competitiveness and ensuring that all consumers can purchase energy at affordable prices. A well-functioning internal market in electricity should provide producers with appropriate incentives for investing in new power generation, including in electricity from renewable energy sources, paying special attention to the most isolated Member States and regions in the Union's energy market. A well-functioning market should also provide consumers with adequate measures to promote more efficient use of energy, which presupposes a secure supply of energy.

 

(2)

Security of energy supply is an essential element of public security and is therefore inherently connected to the efficient functioning of the internal market in electricity and the integration of the isolated electricity markets of Member States. Electricity can reach the citizens of the Union only through the network. Functioning electricity markets and, in particular, the networks and other assets associated with electricity supply are essential to public security, to economic competitiveness and to the well-being of the citizens of the Union.

 

(3)

Regulation (EC) No 714/2009 sets out non-discriminatory rules for access conditions to the network for cross-border exchanges in electricity and, in particular, rules on capacity allocation and congestion management for interconnections and transmission systems affecting cross-border electricity flows. In order to move towards a genuinely integrated electricity market, the current rules on capacity allocation, congestion management and trade in electricity should be further harmonised. This Regulation therefore sets out minimum harmonised rules for the ultimately single day-ahead and intraday coupling, in order to provide a clear legal framework for an efficient and modern capacity allocation and congestion management system, facilitating Union-wide trade in electricity, allowing more efficient use of the network and increasing competition, for the benefit of consumers.

 

(4)

To implement single day-ahead and intraday coupling, the available cross-border capacity needs to be calculated in a coordinated manner by the Transmission System Operators (hereinafter ‘TSOs’). For this purpose, they should establish a common grid model including estimates on generation, load and network status for each hour. The available capacity should normally be calculated according to the so-called flow-based calculation method, a method that takes into account that electricity can flow via different paths and optimises the available capacity in highly interdependent grids. The available cross-border capacity should be one of the key inputs into the further calculation process, in which all Union bids and offers, collected by power exchanges, are matched, taking into account available cross-border capacity in an economically optimal manner. Single day-ahead and intraday coupling ensures that power usually flows from low- price to high- price areas.

 

(5)

The market coupling operator (hereinafter ‘MCO’) uses a specific algorithm to match...


More

This text has been adopted from EUR-Lex.

 

5.

Sources and disclaimer

For further information you may want to consult the following sources that have been used to compile this dossier:

This dossier is compiled each night drawing from aforementioned sources through automated processes. We have invested a great deal in optimising the programming underlying these processes. However, we cannot guarantee the sources we draw our information from nor the resulting dossier are without fault.

 

6.

Full version

This page is also available in a full version containing the legal context, de Europese rechtsgrond, other dossiers related to the dossier at hand and the related cases of the European Court of Justice.

The full version is available for registered users of the EU Monitor by ANP and PDC Informatie Architectuur.

7.

EU Monitor

The EU Monitor enables its users to keep track of the European process of lawmaking, focusing on the relevant dossiers. It automatically signals developments in your chosen topics of interest. Apologies to unregistered users, we can no longer add new users.This service will discontinue in the near future.