(1) | to vote in favour of the CTE proposed revision of UTP LOC&PAS applicable to the subsystem ‘rolling stock – locomotives and passenger rolling stock’, as found in the CTE Working Document TECH-25003 UTP LOC&PAS, subject to the following amendments:
(a) | in section 1 (Introduction) of the Annex, second paragraph, replace the word ‘infrastructure’ by ‘network(s)’; |
(b) | in point 2.1 (The rolling stock subsystem as part of the rail system) of the Annex, fourth paragraph, delete, ‘UTP WAG’; |
(c) | in point 2.2.1 (Train formation), paragraph (1), replace the term ‘OTIF technical admission’ by ‘UTP verification procedure’; |
(d) | delete points 3.2.1 (General requirements, requirements related to maintenance and operation) and 3.2.2 (Requirements specific to other subsystems); |
(e) | in point 4.2.3.4.2 (Running dynamic behaviour), replace the title of paragraph (d) (Interfaces between the unit and the control-command and signalling subsystem) by ‘Additional requirements regarding interface with on-board part of the control-command and signalling subsystem’; |
(f) | in paragraph (8) of point 4.2.3.4.2 (Running dynamic behaviour), in paragraphs (3) and (4) of point 4.2.4.3 (Type of brake system), in paragraph (3) of point 4.2.4.4.1 (Emergency braking command), in paragraph (5) of point 4.2.4.4.2 (Service braking command), in paragraph (4) of point 4.2.4.4.4 (Dynamic braking command), in paragraph (6) of point 4.2.4.8.2 (Magnetic track brake), in paragraph (9) of point 4.2.4.8.3 (Eddy current track brake), in paragraph (2) of point 4.2.5.5.6 (Door opening), in paragraph (8) of point 4.2.8.1.2 (Requirements on performance), in paragraph (4) of point 4.2.8.2.4 (Maximum power and current from the overhead contact line), in paragraph (5), second subparagraph, of point 4.2.8.2.9.8 (Running through phase or system separation sections (RST level)), in paragraphs (5) and (6) of point 4.2.9.1.6 (Driver’s desk-Ergonomics), in paragraph (4) of point 4.2.9.3.6 (Radio Remote control function by staff for shunting operation), in points 4.2.9.3.8.1 (Sleeping mode), 4.2.9.3.8.2 (Passive shunting), 4.2.9.3.8.3 (Non leading), 4.2.9.3.9 (Traction status), in paragraph (5) of point 4.2.10.4.2 (Smoke Control), in point 4.2.13 (Interface requirements with Automated Train Operation on-board):
— | replace ‘signalling system’ by ‘control-command and signalling subsystem’; |
— | delete ‘See point 4.3.4’; |
|
(g) | in point 4.2.4.6.1 (Limit of wheel rail adhesion profile), delete the wording ‘Note to points (1) – (4):’; |
(h) | in point 4.2.4.7 (Dynamic brake – Braking system linked to traction system), replace the third paragraph by ‘For electric units, in case the presence on-board the unit of the voltage delivered by the external power supply is a condition for the dynamic brake application, the safety analysis shall cover failures leading to absence on-board the unit of that voltage.’; |
(i) | in point 4.2.7.1.4 (Lamp controls), paragraph (3), replace ‘a flashing/blinking mode’ by ‘an automatic flashing/blinking mode’; |
(j) | in paragraph (1) of point 4.2.9.6 (Recording device), replace the fourth subparagraph by ‘Additional data pertaining to the on-board control-command and signalling subsystem may be required to be recorded’; |
(k) | in point 4.2.12.2 (General documentation), paragraph (24):
— | in the first indent, replace ‘signalling equipment’ by ‘control-command and signalling subsystem’; |
— | replace the second indent by ‘conditions for the installation of on-board part of the control-command and signalling subsystem (e.g. mechanical, electrical, etc.).’; |
|
(l) | in point 6.2.6 (Assessment of documentation requested for operation and maintenance), paragraph (1), delete ‘and assessing entity’; |
(m) | in point 7.3.2 (List of specific cases), delete all specific cases for the United Kingdom in respect of Northern Ireland; |
|