Legal provisions of COM(1999)330 - Incineration of waste

Please note

This page contains a limited version of this dossier in the EU Monitor.

dossier COM(1999)330 - Incineration of waste.
document COM(1999)330 EN
date December  4, 2000


Article 1 - Objectives

The aim of this Directive is to prevent or to limit as far as practicable negative effects on the environment, in particular pollution by emissions into air, soil, surface water and groundwater, and the resulting risks to human health, from the incineration and co-incineration of waste.

This aim shall be met by means of stringent operational conditions and technical requirements, through setting emission limit values for waste incineration and co-incineration plants within the Community and also through meeting the requirements of Directive 75/442/EEC.

Article 2 - Scope

1. This Directive covers incineration and co-incineration plants.

2. The following plants shall however be excluded from the scope of this Directive:

(a) Plants treating only the following wastes:

(i) vegetable waste from agriculture and forestry,

(ii) vegetable waste from the food processing industry, if the heat generated is recovered,

(iii) fibrous vegetable waste from virgin pulp production and from production of paper from pulp, if it is co-incinerated at the place of production and the heat generated is recovered,

(iv) wood waste with the exception of wood waste which may contain halogenated organic compounds or heavy metals as a result of treatment with wood-preservatives or coating, and which includes in particular such wood waste originating from construction and demolition waste,

(v) cork waste,

(vi) radioactive waste,

(vii) animal carcasses as regulated by Directive 90/667/EEC without prejudice to its future amendments,

(viii) waste resulting from the exploration for, and the exploitation of, oil and gas resources from off-shore installations and incinerated on board the installation;

(b) Experimental plants used for research, development and testing in order to improve the incineration process and which treat less than 50 tonnes of waste per year.

Article 3 - Definitions

For the purposes of this Directive:

1. 'waste' means any solid or liquid waste as defined in Article 1(a) of Directive 75/442/EEC;

2. 'hazardous waste' means any solid or liquid waste as defined in Article 1(4) of Council Directive 91/689/EEC of 12 December 1991 on hazardous waste(19).

For the following hazardous wastes, the specific requirements for hazardous waste in this Directive shall not apply:

(a) combustible liquid wastes including waste oils as defined in Article 1 of Council Directive 75/439/EEC of 16 June 1975 on the disposal of waste oils(20) provided that they meet the following criteria:

(i) the mass content of polychlorinated aromatic hydrocarbons, e.g. polychlorinated biphenyls (PCB) or pentachlorinated phenol (PCP) amounts to concentrations not higher than those set out in the relevant Community legislation;

(ii) these wastes are not rendered hazardous by virtue of containing other constituents listed in Annex II to Directive 91/689/EEC in quantities or in concentrations which are inconsistent with the achievement of the objectives set out in Article 4 of Directive 75/442/EEC; and

(iii) the net calorific value amounts to at least 30 MJ per kilogramme,

(b) any combustible liquid wastes which cannot cause, in the flue gas directly resulting from their combustion, emissions other than those from gasoil as defined in Article 1(1) of Directive 93/12/EEC(21) or a higher concentration of emissions than those resulting from the combustion of gasoil as so defined;

3. 'mixed municipal waste' means waste from households as well as commercial, industrial and institutional waste, which because of its nature and composition is similar to waste from households, but excluding fractions indicated in the Annex to Decision 94/3/EC(22) under heading 20 01 that are collected separately at source and excluding the other wastes indicated under heading 20 02 of that Annex;

4. 'incineration plant' means any stationary or mobile technical unit and equipment dedicated to the thermal treatment of wastes with or without recovery of the combustion heat generated. This includes the incineration by oxidation of waste as well as other thermal treatment processes such as pyrolysis, gasification or plasma processes in so far as the substances resulting from the treatment are subsequently incinerated.

This definition covers the site and the entire incineration plant including all incineration lines, waste reception, storage, on site pretreatment facilities, waste-fuel and air-supply systems, boiler, facilities for the treatment of exhaust gases, on-site facilities for treatment or storage of residues and waste water, stack, devices and systems for controlling incineration operations, recording and monitoring incineration conditions;

5. 'co-incineration plant' means any stationary or mobile plant whose main purpose is the generation of energy or production of material products and:

- which uses wastes as a regular or additional fuel; or

- in which waste is thermally treated for the purpose of disposal.

If co-incineration takes place in such a way that the main purpose of the plant is not the generation of energy or production of material products but rather the thermal treatment of waste, the plant shall be regarded as an incineration plant within the meaning of point 4.

This definition covers the site and the entire plant including all co-incineration lines, waste reception, storage, on site pretreatment facilities, waste-, fuel- and air-supply systems, boiler, facilities for the treatment of exhaust gases, on-site facilities for treatment or storage of residues and waste water, stack devices and systems for controlling incineration operations, recording and monitoring incineration conditions;

6. 'existing co-incineration or co-incineration plant' means an incineration or co-incineration plant:

(a) which is in operation and has a permit in accordance with existing Community legislation before 28 December 2002, or,

(b) which is authorised or registered for incineration or co-incineration and has a permit issued before 28 December 2002 in accordance with existing Community legislation, provided that the plant is put into operation not later than 28 December 2003, or

(c) which, in the view of the competent authority, is the subject of a full request for a permit, before 28 December 2002, provided that the plant is put into operation not later than 28 December 2004;

7. 'nominal capacity' means the sum of the incineration capacities of the furnaces of which an incineration plant is composed, as specified by the constructor and confirmed by the operator, with due account being taken, in particular, of the calorific value of the waste, expressed as the quantity of waste incinerated per hour;

8. 'emission' means the direct or indirect release of substances, vibrations, heat or noise from individual or diffuse sources in the plant into the air, water or soil;

9. 'emission limit values' means the mass, expressed in terms of certain specific parameters, concentration and/or level of an emission, which may not be exceeded during one or more periods of time;

10. 'dioxins and furans' means all polychlorinated dibenzo-p-dioxins and dibenzofurans listed in Annex I;

11. 'operator' means any natural or legal person who operates or controls the plant or, where this is provided for in national legislation, to whom decisive economic power over the technical functioning of the plant has been delegated;

12. 'permit' means a written decision (or several such decisions) delivered by the competent authority granting authorisation to operate a plant, subject to certain conditions which guarantee that the plant complies with all the requirements of this Directive. A permit may cover one or more plants or parts of a plant on the same site operated by the same operator;

13. 'residue' means any liquid or solid material (including bottom ash and slag, fly ash and boiler dust, solid reaction products from gas treatment, sewage sludge from the treatment of waste waters, spent catalysts and spent activated carbon) defined as waste in Article 1(a) of Directive 75/442/EEC, which is generated by the incineration or co-incineration process, the exhaust gas or waste water treatment or other processes within the incineration or co-incineration plant.

Article 4 - Application and permit

1. Without prejudice to Article 11 of Directive 75/442/EEC or to Article 3 of Directive 91/689/EEC, no incineration or co-incineration plant shall operate without a permit to carry out these activities.

2. Without prejudice to Directive 96/61/EC, the application for a permit for an incineration or co-incineration plant to the competent authority shall include a description of the measures which are envisaged to guarantee that:

(a) the plant is designed, equipped and will be operated in such a manner that the requirements of this Directive are taking into account the categories of waste to be incinerated;

(b) the heat generated during the incineration and co-incineration process is recovered as far as practicable e.g. through combined heat and power, the generating of process steam or district heating;

(c) the residues will be minimised in their amount and harmfulness and recycled where appropriate;

(d) the disposal of the residues which cannot be prevented, reduced or recycled will be carried out in conformity with national and Community legislation.

3. The permit shall be granted only if the application shows that the proposed measurement techniques for emissions into the air comply with Annex III and, as regards water, comply with Annex III paragraphs 1 and 2.

4. The permit granted by the competent authority for an incineration or co-incineration plant shall, in addition to complying with any applicable requirement laid down in Directives 91/271/EEC, 96/61/EC, 96/62/EC, 76/464/EEC and 1999/31/EC:

(a) list explicitly the categories of waste which may be treated. The list shall use at least the categories of waste set up in the European Waste Catalogue (EWC), if possible, and contain information on the quantity of waste, where appropriate;

(b) include the total waste incinerating or co-incinerating capacity of the plant;

(c) specify the sampling and measurement procedures used to satisfy the obligations imposed for periodic measurements of each air and water pollutants.

5. The permit granted by the competent authority to an incineration or co-incineration plant using hazardous waste shall in addition to paragraph 4:

(a) list the quantities of the different categories of hazardous waste which may be treated;

(b) specify the minimum and maximum mass flows of those hazardous wastes, their lowest and maximum calorific values and their maximum contents of pollutants, e.g. PCB, PCP, chlorine, fluorine, sulphur, heavy metals.

6. Without prejudice to the provisions of the Treaty, Member States may list the categories of waste to be mentioned in the permit which can be co-incinerated in defined categories of co-incineration plants.

7. Without prejudice to Directive 96/61/EC, the competent authority shall periodically reconsider and, where necessary, update permit conditions.

8. Where the operator of an incineration or co-incineration plant for non-hazardous waste is envisaging a change of operation which would involve the incineration or co-incineration of hazardous waste, this shall be regarded as a substantial change within the meaning of Article 2(10)(b) of Directive 96/61/EC and Article 12(2) of that Directive shall apply.

9. If an incineration or co-incineration plant does not comply with the conditions of the permit, in particular with the emission limit values for air and water, the competent authority shall take action to enforce compliance.

Article 5 - Delivery and reception of waste

1. The operator of the incineration or co-incineration plant shall take all necessary precautions concerning the delivery and reception of waste in order to prevent or to limit as far as practicable negative effects on the environment, in particular the pollution of air, soil, surface water and groundwater as well as odours and noise, and direct risks to human health. These measures shall meet at least the requirements set out in paragraphs 3 and 4.

2. The operator shall determine the mass of each category of waste, if possible according to the EWC, prior to accepting the waste at the incineration or co-incineration plant.

3. Prior to accepting hazardous waste at the incineration or co-incineration plant, the operator shall have available information about the waste for the purpose of verifying, inter alia, compliance with the permit requirements specified in Article 4(5). This information shall cover:

(a) all the administrative information on the generating process contained in the documents mentioned in paragraph 4(a);

(b) the physical, and as far as practicable, chemical composition of the waste and all other information necessary to evaluate its suitability for the intended incineration process;

(c) the hazardous characteristics of the waste, the substances with which it cannot be mixed, and the precautions to be taken in handling the waste.

4. Prior to accepting hazardous waste at the incineration or co-incineration plant, at least the following reception procedures shall be carried out by the operator:

(a) the checking of those documents required by Directive 91/689/EEC and, where applicable, those required by Council Regulation (EEC) No 259/93 of 1 February 1993 on the supervision, and control of shipments of waste within, into and out of the European Community(23) and by dangerous-goods transport regulations;

(b) the taking of representative samples, unless inappropriate, e.g. for infectious clinical waste, as far as possible before unloading, to verify conformity with the information provided for in paragraph 3 by carrying out controls and to enable the competent authorities to identify the nature of the wastes treated. These samples shall be kept for at least one month after the incineration.

5. The competent authorities may grant exemptions from paragraphs 2, 3 and 4 for industrial plants and undertakings incinerating or co-incinerating only their own waste at the place of generation of the waste provided that the requirements of this Directive are met.

Article 6 - Operating conditions

1. Incineration plants shall be operated in order to achieve a level of incineration such that the slag and bottom ashes Total Organic Carbon (TOC) content is less than 3 % or their loss on ignition is less than 5 % of the dry weight of the material. If necessary appropriate techniques of waste pretreatment shall be used.

Incineration plants shall be designed, equipped, built and operated in such a way that the gas resulting from the process is raised, after the last injection of combustion air, in a controlled and homogeneous fashion and even under the most unfavourable conditions, to a temperature of 850 °C, as measured near the inner wall or at another representative point of the combustion chamber as authorised by the competent authority, for two seconds. If hazardous wastes with a content of more than 1 % of halogenated organic substances, expressed as chlorine, are incinerated, the temperature has to be raised to 1100 °C for at least two seconds.

Each line of the incineration plant shall be equipped with at least one auxiliary burner. This burner must be switched on automatically when the temperature of the combustion gases after the last injection of combustion air falls below 850 °C or 1100 °C as the case may be. It shall also be used during plant start-up and shut-down operations in order to ensure that the temperature of 850 °C or 1100 °C as the case may be is maintained at all times during these operations and as long as unburned waste is in the combustion chamber.

During start-up and shut-down or when the temperature of the combustion gas falls below 850 °C or 1100 °C as the case may be, the auxiliary burner shall not be fed with fuels which can cause higher emissions than those resulting from the burning of gasoil as defined in Article 1(1) of Council Directive 75/716/EEC, liquefied gas or natural gas.

2. Co-incineration plants shall be designed, equipped, built and operated in such a way that the gas resulting from the co-incineration of waste is raised in a controlled and homogeneous fashion and even under the most unfavourable conditions, to a temperature of 850 °C for two seconds. If hazardous wastes with a content of more than 1 % of halogenated organic substances, expressed as chlorine, are co-incinerated, the temperature has to be raised to 1100 °C.

3. Incineration and co-incineration plants shall have and operate an automatic system to prevent waste feed:

(a) at start-up, until the temperature of 850 °C or 1100 °C as the case may be or the temperature specified according to paragraph 4 has been reached;

(b) whenever the temperature of 850 °C or 1100 °C as the case may be or the temperature specified according to paragraph 4 is not maintained;

(c) whenever the continuous measurements required by this Directive show that any emission limit value is exceeded due to disturbances or failures of the purification devices.

4. Conditions different from those laid down in paragraph 1 and, as regards the temperature, paragraph 3 and specified in the permit for certain categories of waste or for certain thermal processes may be authorised by the competent authority, provided the requirements of this Directive are met. Member States may lay down rules governing these authorisations. The change of the operational conditions shall not cause more residues or residues with a higher content of organic pollutants compared to those residues which could be expected under the conditions laid down in paragraph 1.

Conditions different from those laid down in paragraph 2 and, as regards the temperature, paragraph 3 and specified in the permit for certain categories of waste or for certain thermal processes may be authorised by the competent authority, provided the requirements of this Directive are met. Member States may lay down rules governing these authorisations. Such authorisation shall be conditional upon at least the provisions for emission limit values set out in Annex V for total organic carbon and CO being complied with.

In the case of co-incineration of their own waste at the place of its production in existing bark boilers within the pulp and paper industry, such authorisation shall be conditional upon at least the provisions for emission limit values set out in Annex V for total organic carbon being complied with.

All operating conditions determined under this paragraph and the results of verifications made shall be communicated by the Member State to the Commission as part of the information provided in accordance with the reporting requirements.

5. Incineration and co-incineration plants shall be designed, equipped, built and operated in such a way as to prevent emissions into the air giving rise to significant ground-level air pollution; in particular, exhaust gases shall be discharged in a controlled fashion and in conformity with relevant Community air quality standards by means of a stack the height of which is calculated in such a way as to safeguard human health and the environment.

6. Any heat generated by the incineration or the co-incineration process shall be recovered as far as practicable.

7. Infectious clinical waste should be placed straight in the furnace, without first being mixed with other categories of waste and without direct handling.

8. The management of the incineration or the co-incineration plant shall be in the hands of a natural person who is competent to manage the plant.

Article 7 - Air emission limit values

1. Incineration plants shall be designed, equipped, built and operated in such a way that the emission limit values set out in Annex V are not exceeded in the exhaust gas.

2. Co-incineration plants shall be designed, equipped, built and operated in such a way that the emission limit values determined according to or set out in Annex II are not exceeded in the exhaust gas.

If in a co-incineration plant more than 40 % of the resulting heat release comes from hazardous waste, the emission limit values set out in Annex V shall apply.

3. The results of the measurements made to verify compliance with the emission limit values shall be standardised with respect to the conditions laid down in Article 11.

4. In the case of co-incineration of untreated mixed municipal waste, the limit values will be determined according to Annex V, and Annex II will not apply.

5. Without prejudice to the provisions of the Treaty, Member States may set emission limit values for polycyclic aromatic hydrocarbons or other pollutants.

Article 8 - Water discharges from the cleaning of exhaust gases

1. Waste water from the cleaning of exhaust gases discharged from an incineration or co-incineration plant shall be subject to a permit granted by the competent authorities.

2. Discharges to the aquatic environment of waste water resulting from the cleaning of exhaust gases shall be limited as far as practicable, at least in accordance with the emission limit values set in Annex IV.

3. Subject to a specific provision in the permit, the waste water from the cleaning of exhaust gases may be discharged to the aquatic environment after separate treatment on condition that:

(a) the requirements of relevant Community, national and local provisions are complied with in the form of emission limit values; and

(b) the mass concentrations of the polluting substances referred to in Annex IV do not exceed the emission limit values laid down therein.

4. The emission limit values shall apply at the point where waste waters from the cleaning of exhaust gases containing the polluting substances referred to in Annex IV are discharged from the incineration or co-incineration plant.

Where the waste water from the cleaning of exhaust gases is treated on site collectively with other on-site sources of waste water, the operator shall take the measurements referred to in Article 11:

(a) on the waste water stream from the exhaust gas cleaning processes prior to its input into the collective waste water treatment plant;

(b) on the other waste water stream or streams prior to its or their input into the collective waste water treatment plant;

(c) at the point of final waste water discharge, after the treatment, from the incineration plant or co-incineration plant.

The operator shall take appropriate mass balance calculations in order to determine the emission levels in the final waste water discharge that can be attributed to the waste water arising from the cleaning of exhaust gases in order to check compliance with the emission limit values set out in Annex IV for the waste water stream from the exhaust gas cleaning process.

Under no circumstances shall dilution of waste water take place for the purpose of complying with the emission limit values set in Annex IV.

5. When waste waters from the cleaning of exhaust gases containing the polluting substances referred to in Annex IV are treated outside the incineration or co-incineration plant at a treatment plant intended only for the treatment of this sort of waste water, the emission limit values of Annex IV are to be applied at the point where the waste waters leave the treatment plant. If this off-site treatment plant is not only dedicated to treat waste water from incineration, the operator shall take the appropriate mass balance calculations, as provided for under paragraph 4(a), (b) and (c), in order to determine the emission levels in the final waste water discharge that can be attributed to the waste water arising from the cleaning of exhaust gases in order to check compliance with the emission limit values set out in Annex IV for the waste water stream from the exhaust gas cleaning process.

Under no circumstances shall dilution of waste water take place for the purpose of complying with the emission limit values set in Annex IV.

6. The permit shall:

(a) establish emission limit values for the polluting substances referred to in Annex IV, in accordance with paragraph 2 and in order to meet the requirements referred to in paragraph 3(a);

(b) set operational control parameters for waste water at least for pH, temperature and flow.

7. Incineration and co-incineration plant sites, including associated storage areas for wastes, shall be designed and in such a way as to prevent the unauthorised and accidental release of any polluting substances into soil, surface water and groundwater in accordance with the provisions provided for in relevant Community legislation. Moreover, storage capacity shall be provided for contaminated rainwater run-off from the incineration or co-incineration plant site or for contaminated water arising from spillage or fire-fighting operations.

The storage capacity shall be adequate to ensure that such waters can be tested and treated before discharge where necessary.

8. Without prejudice to the provisions of the Treaty, Member States may set emission limit values for polycyclic aromatic hydrocarbons or other pollutants.

Article 9 - Residues

Residues resulting from the operation of the incineration or co-incineration plant shall be minimised in their amount and harmfulness. Residues shall be recycled, where appropriate, directly in the plant or outside in accordance with relevant Community legislation.

Transport and intermediate storage of dry residues in the form of dust, such as boiler dust and dry residues from the treatment of combustion gases, shall take place in such a way as to prevent dispersal in the environment e.g. in closed containers.

Prior to determining the routes for the disposal or recycling of the residues from incineration and co-incineration plants, appropriate tests shall be carried out to establish the physical and chemical characteristics and the polluting potential of the different incineration residues. The analysis shall concern the total soluble fraction and heavy metals soluble fraction.

Article 10 - Control and monitoring

1. Measurement equipment shall be installed and techniques used in order to monitor the parameters, conditions and mass concentrations relevant to the incineration or co-incineration process.

2. The measurement requirements shall be laid down in the permit or in the conditions attached to the permit issued by the competent authority.

3. The appropriate installation and the functioning of the automated monitoring equipment for emissions into air and water shall be subject to control and to an annual surveillance test. Calibration has to be done by means of parallel measurements with the reference methods at least every three years.

4. The location of the sampling or measurement points shall be laid down by the competent authority.

5. Periodic measurements of the emissions into the air and water shall be carried out in accordance with Annex III, points 1 and 2.

Article 11 - Measurement requirements

1. Member States shall, either by specification in the conditions of the permit or by general binding rules, ensure that paragraphs 2 to 12 and 17, as regards air, and paragraphs 9 and 14 to 17, as regards water, are complied with.

2. The following measurements of air pollutants shall be carried out in accordance with Annex III at the incineration and co-incineration plant:

(a) continuous measurements of the following substances: NOx, provided that emission limit values are set, CO, total dust, TOC, HCl, HF, SO2;

(b) continuous measurements of the following process operation parameters: temperature near the inner wall or at another representative point of the combustion chamber as authorised by the competent authority, concentration of oxygen, pressure, temperature and water vapour content of the exhaust gas;

(c) at least two measurements per year of heavy metals, dioxins and furans; one measurement at least every three months shall however be carried out for the first 12 months of operation. Member States may fix measurement periods where they have set emission limit values for polycyclic aromatic hydrocarbons or other pollutants.

3. The residence time as well as the minimum temperature and the oxygen content of the exhaust gases shall be subject to appropriate verification, at least once when the incineration or co-incineration plant is brought into service and under the most unfavourable operating conditions anticipated.

4. The continuous measurement of HF may be omitted if treatment stages for HCl are used which ensure that the emission limit value for HCl is not being exceeded. In this case the emissions of HF shall be subject to periodic measurements as laid down in paragraph 2(c).

5. The continuous measurement of the water vapour content shall not be required if the sampled exhaust gas is dried before the emissions are analysed.

6. Periodic measurements as laid down in paragraph 2(c) of HCl, HF and SO2 instead of continuous measuring may be authorised in the permit by the competent authority in incineration or co-incineration plants, if the operator can prove that the emissions of those pollutants can under no circumstances be higher than the prescribed emission limit values.

7. The reduction of the frequency of the periodic measurements for heavy metals from twice a year to once every two years and for dioxins and furans from twice a year to once every year may be authorised in the permit by the competent authority provided that the emissions resulting from co-incineration or incineration are below 50 % of the emission limit values determined according to Annex II or Annex V respectively and provided that criteria for the requirements to be met, developed in accordance with the procedure laid down in Article 17, are available. These criteria shall at least be based on the provisions of the second subparagraph, points (a) and (d).

Until 1 January 2005 the reduction of the frequency may be authorised even if no such criteria are available provided that:

(a) the waste to be co-incinerated or incinerated consists only of certain sorted combustible fractions of non-hazardous waste not suitable for recycling and presenting certain characteristics, and which is further specified on the basis of the assessment referred to in subparagraph (d);

(b) national quality criteria, which have been reported to the Commission, are available for these wastes;

(c) co-incineration and incineration of these wastes is in line with the relevant waste management plans referred to in Article 7 of Directive 75/442/EEC;

(d) the operator can prove to the competent authority that the emissions are under all circumstances significantly below the emission limit values set out in Annex II or Annex V for heavy metals, dioxins and furans; this assessment shall be based on information on the quality of the waste concerned and measurements of the emissions of the said pollutants;

(e) the quality criteria and the new period for the periodic measurements are specified in the permit; and

(f) all decisions on the frequency of measurements referred to in this paragraph, supplemented with information on the amount and quality of the waste concerned, shall be communicated on a yearly basis to the Commission.

8. The results of the measurements made to verify compliance with the emission limit values shall be standardised at the following conditions and for oxygen according to the formula as referred to in Annex VI:

(a) Temperature 273 K, pressure 101,3 kPa, 11 % oxygen, dry gas, in exhaust gas of incineration plants;

(b) Temperature 273 K, pressure 101,3 kPa, 3 % oxygen, dry gas, in exhaust gas of incineration of waste oil as defined in Directive 75/439/EEC;

(c) when the wastes are incinerated or co-incinerated in an oxygen-enriched atmosphere, the results of the measurements can be standardised at an oxygen content laid down by the competent authority reflecting the special circumstances of the individual case;

(d) in the case of co-incineration, the results of the measurements shall be standardised at a total oxygen content as calculated in Annex II.

When the emissions of pollutants are reduced by exhaust gas treatment in an incineration or co-incineration plant treating hazardous waste, the standardisation with respect to the oxygen contents provided for in the first subparagraph shall be done only if the oxygen content measured over the same period as for the pollutant concerned exceeds the relevant standard oxygen content.

9. All measurement results shall be recorded, processed and presented in an appropriate fashion in order to enable the competent authorities to verify compliance with the permitted operating conditions and emission limit values laid down in this Directive in accordance with procedures to be decided upon by those authorities.

10. The emission limit values for air shall be regarded as being complied with if:

(a) - none of the daily average values exceeds any of the emission limit values set out in Annex V(a) or Annex II;

- 97 % of the daily average value over the year does not exceed the emission limit value set out in Annex V(e) first indent;

(b) either none of the half-hourly average values exceeds any of the emission limit values set out in Annex V(b), column A or, where relevant, 97 % of the half-hourly average values over the year do not exceed any of the emission limit values set out in Annex V(b), column B;

(c) none of the average values over the sample period set out for heavy metals and dioxins and furans exceeds the emission limit values set out in Annex V(c) and (d) or Annex II;

(d) the provisions of Annex V(e), second indent or Annex II, are met.

11. The half-hourly average values and the 10-minute averages shall be determined within the effective operating time (excluding the start-up and shut-off periods if no waste is being incinerated) from the measured values after having subtracted the value of the confidence interval specified in point 3 of Annex III. The daily average values shall be determined from those validated average values.

To obtain a valid daily average value no more than five half-hourly average values in any day shall be discarded due to malfunction or maintenance of the continuous measurement system. No more than ten daily average values per year shall be discarded due to malfunction or maintenance of the continuous measurement system.

12. The average values over the sample period and the average values in the case of periodical measurements of HF, HCl and SO2 shall be determined in accordance with the requirements of Article 10(2) and (4) and Annex III.

13. The Commission, acting in accordance with the procedure laid down in Article 17, shall decide, as soon as appropriate measurement techniques are available within the Community, the date from which continuous measurements of the air emission limit values for heavy metals, dioxins and furans shall be carried out in accordance with Annex III.

14. The following measurements shall be carried out at the point of waste water discharge:

(a) continuous measurements of the parameters referred to in Article 8(6)(b);

(b) spot sample daily measurements of total suspended solids; Member States may alternatively provide for measurements of a flow proportional representative sample over a period of 24 hours;

(c) at least monthly measurements of a flow proportional representative sample of the discharge over a period of 24 hours of the polluting substances referred to in Article 8(3) with respect to items 2 to 10 in Annex IV;

(d) at least every six months measurements of dioxins and furans; however one measurement at least every three months shall be carried out for the first 12 months of operation. Member States may fix measurement periods where they have set emission limit values for polycyclic aromatic hydrocarbons or other pollutants.

15. The monitoring of the mass of pollutants in the treated waste water shall be done in conformity with Community legislation and laid down in the permit as well as the frequency of the measurements.

16. The emission limit values for water shall be regarded as being complied with if:

(a) for total suspended solids (polluting substance number 1), 95 % and 100 % of the measured values do not exceed the respective emission limit values as set out in Annex IV;

(b) for heavy metals (polluting substances number 2 to 10) no more than one measurement per year exceeds the emission limit values set out in Annex IV; or, if the Member State provides for more than 20 samples per year, no more than 5 % of these samples exceed the emission limit values set out in Annex IV;

(c) for dioxins and furans (polluting substance 11), the twice-yearly measurements do not exceed the emission limit value set out in Annex IV.

17. Should the measurements taken show that the emission limit values for air or water laid down in this Directive have been exceeded, the competent authorities shall be informed without delay.

Article 12 - Access to information and public participation

1. Without prejudice to Council Directive 90/313/EEC(24) and Directive 96/61/EC, applications for new permits for incineration and co-incineration plants shall be made available at one or more locations accessible to the public, such as local authority offices, for an appropriate period to enable it to comment on them before the competent authority reaches a decision. That decision, including at least a copy of the permit, and any subsequent updates, shall also be made available to the public.

2. For incineration or co-incineration plants with a nominal capacity of two tonnes or more per hour and notwithstanding Article 15(2) of Directive 96/61/EC, an annual report to be provided by the operator to the competent authority on the functioning and monitoring of the plant shall be made available to the public. This report shall, as a minimum requirement, give an account of the running of the process and the emissions into air and water compared with the emission standards in this Directive. A list of incineration or co-incineration plants with a nominal capacity of less than two tonnes per hour shall be drawn up by the competent authority and shall be made available to the public.

Article 13 - Abnormal operating conditions

1. The competent authority shall lay down in the permit the maximum permissible period of any technically unavoidable stoppages, disturbances, or failures of the purification devices or the measurement devices, during which the concentrations in the discharges into the air and the purified waste water of the regulated substances may exceed the prescribed emission limit values.

2. In the case of a breakdown, the operator shall reduce or close down operations as soon as practicable until normal operations can be restored.

3. Without prejudice to Article 6(3)(c), the incineration plant or co-incineration plant or incineration line shall under no circumstances continue to incinerate waste for a period of more than four hours uninterrupted where emission limit values are exceeded; moreover, the cumulative duration of operation in such conditions over one year shall be less than 60 hours. The 60-hour duration applies to those lines of the entire plant which are linked to one single flue gas cleaning device.

4. The total dust content of the emissions into the air of an incineration plant shall under no circumstances exceed 150 mg/m3 expressed as a half-hourly average; moreover the air emission limit values for CO and TOC shall not be exceeded. All other conditions referred to in Article 6 shall be complied with.

Article 14 - Review clause

Without prejudice to Directive 96/61/EC, the Commission shall submit a report to the European Parliament and the Council before 31 December 2008 based on experience of the application of this Directive, in particular for new plants, and on the progress achieved in emission control techniques and experience in waste management. Furthermore, the report shall be based on the development of the state of technology, of experience in the operation of the plants, of environmental requirements. This report will include a specific section on the application of Annex II.1.1. and in particular on the economic and technical feasibility for existing cement kilns as referred to in the footnote to Annex II.1.1. of respecting the NOx emission limit value for new cement kilns set out in that Annex. The report shall, as appropriate, be accompanied by proposals for revision of the related provisions of this Directive. However, the Commission shall, if appropriate, propose an amendment for Annex II.3 before the said report, if major waste streams are directed to types of co-incineration plants other than those dealt with in Annex II.1 and II.2.

Article 15 - Reporting

The reports on the implementation of this Directive shall be established in accordance with the procedure laid down in Article 5 of Council Directive 91/692/EEC. The first report shall cover at least the first full three-year period after 28 December 2002 and comply with the periods referred to in Article 17 of Directive 94/67/EC and in Article 16(3) of Directive 96/61/EC. To this effect, the Commission shall elaborate the appropriate questionnaire in due time.

Article 16 - Future adaptation of the directive

The Commission shall, in accordance with the procedure laid down in Article 17(2), amend Articles 10, 11 and 13 and Annexes I and III in order to adapt them to technical progress or new findings concerning the health benefits of emission reductions.

Article 17 - Regulatory committee

1. The Commission shall be assisted by a regulatory committee.

2. Where reference is made to this paragraph, Articles 5 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.

The period laid down in Article 5(6) of Decision 1999/468/EC shall be set at three months.

3. The committee shall adopt its own rules of procedure.

Article 18 - Repeal

The following shall be repealed as from 28 December 2005:

(a) Article 8(1) and the Annex to Directive 75/439/EEC;

(b) Directive 89/369/EEC;

(c) Directive 89/429/EEC;

(d) Directive 94/67/EC.

Article 19 - Penalties

The Member States shall determine penalties applicable to breaches of the national provisions adopted pursuant to this Directive. The penalties thus provided for shall be effective, proportionate and dissuasive. The Member States shall notify those provisions to the Commission by 28 December 2002 at the latest and shall notify it without delay of any subsequent amendment affecting them.

Article 20 - Transitional provisions

1. Without prejudice to the specific transitional provisions provided for in the Annexes to this Directive, the provisions of this Directive shall apply to existing plants as from 28 December 2005.

2. For new plants, i.e. plants not falling under the definition of 'existing incineration or co-incineration plant' in Article 3(6) or paragraph 3 of this Article, this Directive, instead of the Directives mentioned in Article 18, shall apply as from 28 December 2002.

3. Stationary or mobile plants whose purpose is the generation of energy or production of material products and which are in operation and have a permit in accordance with existing Community legislation where required and which start co-incinerating waste not later than 28 December 2004 are to be regarded as existing co-incineration plants.

Article 21 - Implementation

1. Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive not later than 28 December 2002. They shall forthwith inform the Commission thereof.

When Member States adopt those measures, they shall contain a reference to this Directive or be accompanied by such reference on the occasion of their official publication. The methods of making such reference shall be laid down by the Member States.

2. Member States shall communicate to the Commission the text of the provisions of domestic law which they adopt in the field governed by this Directive.

Article 22 - Entry into force

This Directive shall enter into force on the day of its publication in the Official Journal of the European Communities.

Article 23 - Addressees

This Directive is addressed to the Member States.